- Security
- Card reader access required to enter facility
- Biometric scanner access required to enter data center floor
- Proximity readers track all movement between areas
- Security cameras recorded by digital video recorder
- Bullet-proofing behind all windowed areas
- AC Power Systems
- Facility rated at 100 watts per square foot
- Four 3,000 KW transformers (N+1 configuration)
- 60 United Power PDU’s
- UPS
- Six 2000 KVA Powerware UPS Systems (1+1 configuration)
- 320 UPS power distribution panels
- UPS-fed panels are fully redundant
- UPS provides instantaneous conditioned power for facilities until generator synchronization; transfer of power is automatic
- 30 minutes battery life at peak load
- Generator
- Two sets of four 1,500 KW Cummins diesel generators (1+1 configuration)
- Generators activate and fully synchronize within 30 seconds
- Each generator has its own supply system with 2500 gallon tank
- Three fuel suppliers under contract to deliver fuel as needed
- 48-hour on site fuel capacity under full load
- Fire Suppression
- Siemens Cerberus Pyrotronics System with Vesda smoke detection
- Pre-action dry pipe fire suppression system
- Portable dry-chemical fire extinguishers
- Fire doors and firewall's protecting separate facility areas
- Heavy-duty lightning rod grid
- HVAC
- 720,000 CFM delivered to raised floor area
- 3,000 Tons of cooling capacity (N+1 configuration)
- Thirty-eight air handling units equipped with HEPA filtration
- Three 1,000-Ton McQuay centrifugal chillers
- Three cooling towers, chilled water loop pumps, and condenser water loop pumps
- Redundant water sources for cooling towers
- Facility Monitoring
- OpenNMS network monitoring software
- Pacific-Rim Facility Monitoring System
- Temperature and humidity controlled by Trane Tracer Summit Control system
- Electrical Systems monitoring by Eaton FORSEER Systems
- Customer Rack Systems
- Standard Rital & APW cabinets (7' x 24" racks with 19" mounting)
- Customer cabinets set with 1+1 redundant power to PDU
|